Offshore Taranto

  • Client: Confidential information
  • Location: Italy - Taranto – Ionian Sea
  • Turbine Equipment: self-supported tower 60 m
  • Total Capacity:
  • Completed: 2011-10-18
  • Homes Powered:

HightLight

Installation of a 60 m self-supported anemometric tower located at the breakwater in the outer rotation of the Gulf of Taranto in the Ionic Sea.

  • transport of the tower on barge with a crane in accordance with the navigation code
  • installation of the sections of tower with crane from helicopter
  • complexity of the on-site coordination due to the high risk of the operations carried out
  • specific materials and equipment suitable for the particular environmental and climatic conditions of the installation site.

Idnamic Italy was the first Italian company to perform this particular type of installation in the entire Mediterranean Sea.